Outline a risk mitigation strategy for the each of high risk


Assignmnent

For the given scenario, your group needs to complete the following:

1. Work together with role playing (1 Project Manager, 1 customer, others may be system architects and developers) to identify the system requirements and all risks, and rate each risk.

2. Each member selects 1 of the highest risks. Explain why these are considered high-risk, and explain their potential effect on the project.

3. Outline a risk mitigation strategy for the each of the selected high risks.

4. Summarize the challenges the team faced and how you worked them out.

5. Create a 10-15-slide PowerPoint presentation with audio narration that covers 1-4 above. Each member needs to add an audio presentation for his or her selected risk.

6. Groups must incorporate the critique provided by the group members into the draft. The group members must each perform a final review of the entire assignment submission and confirm any final items that require clarification, editing, corrections, and so on. One group member will then submit the final assignment.

Format your assignment according to the following formatting requirements:

1. The answer should be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides.

2. The response also includes a cover page containing the title of the assignment, the student's name, the course title, and the date. The cover page is not included in the required page length.

3. Also include a reference page. The Citations and references should follow APA format. The reference page is not included in the required page length.

Solution Preview :

Prepared by a verified Expert
Project Management: Outline a risk mitigation strategy for the each of high risk
Reference No:- TGS03023016

Now Priced at $50 (50% Discount)

Recommended (94%)

Rated (4.6/5)