One of these is the standard model while the other is the


Billy Penny is trying to determine how many units of two types of lawn mowers to produce each day. One of these is the Standard model, while the other is the Deluxe model. The profit per unit on the Standard model is $60, while the profit per unit on the Deluxe model is $40. The Standard model requires 20 minutes of assembly time, while the Deluxe model requires 35 minutes of assembly time. The Standard model requires 10 minutes of inspection time, while the Deluxe model requires 15 minutes of inspection time. The company must fill an order for 6 Deluxe models. There are 450 minutes of assembly time and 180 minutes of inspection time available each day.
Formulate as an LP, solve using QM, then interpret your output (the optimal solution, the reduced costs, slack/surplus, dual prices, ranges of feasibility, ranges of optimality)

Request for Solution File

Ask an Expert for Answer!!
Econometrics: One of these is the standard model while the other is the
Reference No:- TGS0568695

Expected delivery within 24 Hours