One load absorbs 15kw at a 0707 pf lagging determine a the


Two loads connected in parallel draw a total of 2.4 kW at 0.8 pf lagging from a 120-V rms, 60-Hz line. One load absorbs 1.5kW at a 0.707 pf lagging. Determine: (a) the pf of the second load, (b) the parallel element required to correct the pf to 0.9 lagging for the two loads.

Request for Solution File

Ask an Expert for Answer!!
Electrical Engineering: One load absorbs 15kw at a 0707 pf lagging determine a the
Reference No:- TGS0631266

Expected delivery within 24 Hours