Name and discuss 3 items that were done to minimize project


Construction Management Assignments 1 and 2

Assignment 1

Panama Canal Case - Read and Answer Questions

1.Name AND discuss 3 items that were done to minimize project risk
2.Name AND discuss 5 things that could have been done to minimize risk, but were not
3.Name at least 5 additional categories of risk specific to projects of this nature.

Article: Anatomy of a Faild Project: The First Panama Canal Project.

Assignment 2

Research an article in print or on the WEB that describes a current construction project and identify 5 construction risks specific to that project.

Submit a report (MS Word Document)), minimum of 750 words which is to include::

1. A pdf of the article as an attachment to your submission

2. Your summary of the article describing the project.

3. Your list of 5 potential risks with a description and why you believe that each is pertinent to the project you have selected.

Solution Preview :

Prepared by a verified Expert
Civil Engineering: Name and discuss 3 items that were done to minimize project
Reference No:- TGS02168093

Now Priced at $40 (50% Discount)

Recommended (91%)

Rated (4.3/5)