Murri corporation has an activity-based costing system with


Murri Corporation has an activity-based costing system with three activity cost pools-Processing, Setting Up, and Other. The company's overhead costs, which consist of factory utilities and indirect labor, are allocated to the cost pools in proportion to the activity cost pools' consumption of resources. Costs in the Processing cost pool are assigned to products based on machine-hours (MHs) and costs in the Setting Up cost pool are assigned to products based on the number of batches. Costs in the Other cost pool are not assigned to products. Data concerning the two products and the company's costs and activity-based costing system appear below: Factory utilities (total) $ 35,100 Indirect labor (total) $ 12,900 Distribution of Resources Consumption Across Activity Cost Pools Processing Setting up Other Factory utilities 0.40 0.30 0.30 Indirect labor 0.40 0.50 0.10 MHs Batches Product X7 3,200 900 Product L4 7,900 500 Total 11,100 1,400 Product X7 Product L4 Sales (total) $ 81,800 $ 100,200 Direct materials (total) $ 26,600 $ 37,400 Direct labor (total) $ 33,900 $ 41,600 Required: a. Assign overhead costs to activity cost pools using activity-based costing. (Omit the "$" sign in your response.) Activity Cost Pools Processing Setting up Other Total Factory utilities $ $ $ $ Indirect labor Total $ $ $ $ b. Calculate activity rates for each activity cost pool using activity-based costing. (Round your answers to 2 decimal places. Omit the "$" sign in your response.) Activity Rate Processing $ per MH Setting up $ per batch c. Determine the amount of overhead cost that would be assigned to each product using activity-based costing. (Omit the "$" sign in your response.) Product X7 Product L4 Processing $ $ Setting up Total $ $ d. Determine the product margins for each product using activity-based costing. (Omit the "$" sign in your response.) Product Margin Product X7 $ Product L4 $

Request for Solution File

Ask an Expert for Answer!!
Financial Accounting: Murri corporation has an activity-based costing system with
Reference No:- TGS01694556

Expected delivery within 24 Hours