Material for an earth filll was available from borrow sites


1.Material for an earth filll was available from borrow sites at $6.4 per cubic meter and a void ratio of 0.8. In the compacted state the fill measured 100,000m3 at void ratio of 0.7. what will be the total cost of the material in compacted state?

2.A maximum flow rate of 6 CFS is available for a river model. This corresponds to 30,000 CFS for the prototype. What is the scale of the model in terms of the prototype size?