Manufacturing-production scheduling bata aerobics


Question: MANUFACTURING-PRODUCTION SCHEDULING Bata Aerobics manufactures two models of steppers used for aerobic exercises. Manufacturing each luxury model requires 10 lb of plastic and 10 min of labor. Manufacturing each standard model requires 16 lb of plastic and 8 min of labor. The profit for each luxury model is $40, and the profit for each standard model is $30. If 6000 lb of plastic and 60 laborhours are available for the production of the steppers per day, how many steppers of each model should Bata produce each day in order to maximize its profit? What is the optimal profit?