Machine 1 is available for 150 hours machine 2 for 240


The Midland Tool Shop has four heavy presses it uses to stamp out prefabricated metal covers and housings for electronic consumer products. All four presses operate differently and are of different sizes. Currently the firm has a contract to produce three products. The contract calls for 400 units of product 1; 570 units of products 2; and 320 units of product 3. The time (in minutes) required for each product to be produced on each machine is as follows:

Product 1 2 3 4
1 35 41 34 39
2 40 36 32 43
3 38 37 33 40

Machine 1 is available for 150 hours, machine 2 for 240 hours, machine 3 for 200 hours, and machine 4 for 250 hours. The products also result in different profits, according to the machine they are produced on, because of time, waste and operating cost. The profit per unit per machine for each product is summarized as follows:

Product 1 2 3 4
1 $7.8 $7.8 $8.2 $7.9
2 6.7 8.9 9.2 6.3
3 8.4 8.1 9.0 5.8

The company wants to know how many units of each product to produce on each machine in order to maximize profit.

a. Solve the model using the computer.

Solution Preview :

Prepared by a verified Expert
Engineering Mathematics: Machine 1 is available for 150 hours machine 2 for 240
Reference No:- TGS01268967

Now Priced at $10 (50% Discount)

Recommended (95%)

Rated (4.7/5)