Journalize the entry to record the factory labor cost and


Question - Moura industries inc. manufactures recreational vehicles. moura uses a job order cost system. the time tickets from august jobs are summarized below

job 410 3,400

job 411 1,700

job 412 1,400

job 413 2,500

factory supervision 1,900

Factory overhead is applied to jobs on the basis of a predetermined overhead rate of 25 per direct labor hour. The direct labor rate is 15 per hour.

Journalize the entry to record the factory labor cost and journalize the entry to apply factory overhead to production for august.

Solution Preview :

Prepared by a verified Expert
Accounting Basics: Journalize the entry to record the factory labor cost and
Reference No:- TGS02564376

Now Priced at $25 (50% Discount)

Recommended (94%)

Rated (4.6/5)