Itne3008 - advanced switching build a small network using


Case Study

I. OUTLINE

This Case Study will require you to
1) Build a small network using three switches and one router
2) One switch will run as a distribution layer switch, the other two will run as access layer switches
3) A router will be connected to the distribution layer switch using 802.1Q trunking to route between subnets
4) The switches will be connected with two Ethernet links using Ether-channel bonding
5) The distribution layer switch will be configured as the STP root bridge

II. CASE STUDY

DETAILS
Your Lab Supervisor will provide your group with your:
- Company/orgnaisation name
- Allocated network address information
- Subnetting requirements for four LANs to operate within your organisation
- VLAN numbers and VLAN names for each of the four LANs
- Network Management VLAN to use in your network
These details will be provided once you have registered your group within ESP and provided those details to your supervisor.

LOGICAL NETWORK TOPOLOGY

The logical topology for the organisations network is depicted in the figure below. Your organization consists of four LANs which will each be connected to a single router to route traffic between subnets.

1984_LAN.jpg

NETWORK ADDRESSING
Ask your staff and get the sub netting requirements for each of your four LANs. When sub netting your network to accommodate the required hosts for each of your four LANs, you must:

- Ensure that you have enough subnets to address the entire network

- Allocate a subnet for the management network (switches and routers) large enough to cover network growth of double the current amount of infrastructure

- Subnet optimally such that the largest number of IP addresses within your allocated network remain for future expansion

In your final report, you must explain your sub netting process and show your calculations.

LAN1 - Hosts LAN2 - Hosts LAN3 - Hosts LAN4 - Hosts

8000

2000

500

100

4000

1000

250

58

2000

500

100

28

1000

250

58

10

8000

500

100

28

8000

4000

100

58

1000

500

28

10

500

250

28

10

250

100

58

28

2000

1000

250

58

3000

2000

500

250

1000

500

250

150

V. SWITCH PORT ALLOCATION

You have been provided with five VLAN identifiers for your network, one for each of your four LANs and one for your management VLAN. You have been provided with appropriate names for the VLANs covering the subnets. The physical topology of your network must match the network diagram below.

443_LAN1.jpg

For each port on the four network devices, you must nominate:
- Whether it will operate in access or trucking mode
- Which VLANs are allocated to which ports, and on which switches
- Which ports will be disabled

In your final report, you must explain your decision process for switch port allocation.

VI. BASIC DEVICE CONFIGURATION

You are required to configure all switches and routers with the following information:
- Device names
- Message of the Day - Interface descriptions
- Console and Enable passwords
- ssh Access
- All router interfaces are to have the lowest usable IP address of their allocated subnet

Further, all switches should be configured such that:
- Unallocated ports are disabled
- Appropriate switch-port security is configured

In your report you will need to justify your switch port security decisions and configurations.

VII. ADVANCED NETWORK CONFIGURATION

You will be required to configure 802.1Q trunking connections between the switches. Each switch will be connected to another switch via two trunking connections where the second connection is used for redundancy purposes.

You will be required to configure your network Spanning Tree Protocol to PVST+ and to ensure that the distribution layer switch is the Root Bridge.

VIII. ETHERCHANNEL BUNDLING

Network traffic has grown since you first built your network. The Ethernet trunking channels are no longer capable of carrying the offered load on their own. A decision has been made to change the redundant trunking connections between each switch into a bundled Ether Channel to double the maximum throughput.

You must reconfigure your network such that the two links connecting the switches now form an Ether Channel. You must ensure that the distribution layer switch remains the Root Bridge for the Spanning Tree Protocol.

Case Study

A. Testing

As part of the Case Study, you need to devise and document an appropriate testing regime to ensure that all the following

Conditions are met:

1) The nominate level of switchport security is functional

2) Full interconnectivity exists between all hosts in all LANs and the management VLAN

3) The redundant trunking links are functional in the event of failure of the primary links

4) The correct switch is configured as the PVST+ Root Bridge

5) EtherChannel bundling is correctly configured, the channel bandwidth is indeed doubled, and that the root bridge remains properly configured

6) ssh access to all network devices is functionalA. Report Contents

You are required to produce a report that contains the following information.

Subnetting Discussion

A discussion of your subnetting approach, your calculations for each subnet, why particular subnet masks were chosen and how you allocated the subnets to individual networks

Network Drawing

A complete network drawing detailing allocation of addressing information for all relevant hosts and devices. This documentation must include port and VLAN allocation for all devices

Device Configuration Summary

Tables containing the device information that is not included within the network drawing, including:
- Hostname information
- Console, enable and ssh passwords
- Assigned interface descriptions and the MOTD
- Port security summary

Design Discussion

Discussion of your design and decision making processes and reasoning. These discussions must include:
- Swithport allocation reasoning
- Port security reasoning and design
- Spanning Tree implementation details to define the root bridge
- Planning for redundancy and EtherChannel considerations and deployment

Device Output
A copy of the output of the following commands on all devices:
show version
show run
sh ip int brief
sh ip route (routers only)
sh vlan brief (switches only)
sh interface trunk (switches only)

Testing Procedure

An outline of how you built your network and an overview of your testing to verify the complete functionality of your network

B. Video Presentation

You are required to prepare a (no longer than) five minute group video. Each group member must speak for a minimum of 1 minute (four person group) or 1.1/2 minutes (three person group) on the video and clearly identify themselves. The assessment crtieria for the presentation will be individual.

The content of the video presentation will change from semester-to-semester and be provided on Blackboard.

Attachment:- CasestudyAdvancedSwitching.pdf

Solution Preview :

Prepared by a verified Expert
Computer Networking: Itne3008 - advanced switching build a small network using
Reference No:- TGS01560482

Now Priced at $100 (50% Discount)

Recommended (90%)

Rated (4.3/5)