Industrialengineer recently conducted


A corporation is considering implementation of a JIT inventory system. The company's industrialengineer recently conducted a study to determine the average numberof days spent in each activity of the production process. The following table summarizes the findings:

Production Activity Number ofdays
Inspectingmaterials........................................... 3
Storing materials...............................................17
Moving materials into production........................ 3
Setting up production equipment....................... 2
Cutting materials.............................................6
bending materials............................................ 5
Assembing finished products............................ 9
Painting finished products................................ 5
c. calculate the total cycle time
d. determine manufacturing efficiency ratio