Industrial experiment engineers at a computer production


Question: Industrial experiment. Engineers at a computer production plant tested two methods for accuracy in drilling holes into a PC board. They tested how fast they could set the drilling machine by running 10 boards at each of two different speeds. To assess the results, they measured the distance (in inches) from the center of a target on the board to the center of the hole. The data and summary statistics are shown in the table:

882_Distance.png

Write a report summarizing the findings of the experiment. Include appropriate visual and verbal displays of the distributions, and make a recommendation to the engineers if they are most interested in the accuracy of the method.

Solution Preview :

Prepared by a verified Expert
Basic Statistics: Industrial experiment engineers at a computer production
Reference No:- TGS02507942

Now Priced at $15 (50% Discount)

Recommended (90%)

Rated (4.3/5)