In order to comply with regulations an ironsteel sinter


In order to comply with regulations, an iron/steel sinter plant installs an electrostatic precipitator (ESP) to collect 98% of the 10 m particles from an air stream flowing at 2 m3/s. If the effective drift velocity is 0.01 m/s and the available plates have dimensions 1 m x 1.5 m, how many plates are needed?