In calculating the risk associated with two potential


In calculating the risk associated with two potential projects (A & B), which of the following statistical calculations indicates that the projects are equally risky?

The standard deviation ofA is 100, and the coefficient of variation of A is 80.912

The standard deviation of B is 1,000, and the coefficient of variation of B is 809.12

The variance of A’s possible outcomes is 258.10, and the standard deviation of A is 100

The variance of B’s possible outcomes is 2,581, and the standard deviation of B is 1,000

iii and iv

ii and iii

i and ii

i and iv

None of the above