in a double sampling plan the two acceptance


In a double sampling plan the two acceptance numbers are: c1 = 8 and c2 = 12. The number of defectives found in the first sample is 9. Therefore, a second sample is taken. What is the maximum number of defectives allowed in the second sample for the lot to be accepted?

Request for Solution File

Ask an Expert for Answer!!
Operation Management: in a double sampling plan the two acceptance
Reference No:- TGS0402574

Expected delivery within 24 Hours