Improve strat operations by designing a lean value


Project Case - STRAT

You are requested to improve STRAT's operations by designing a lean value stream for their selected flaps product family.

Problem 1) Use all the tools/techniques you have learned in this course and be as detailed as possible to propose a lean flow. Elements of your design should include:

  • Finished goods strategy, continuous flow cell(s)/Pacemaker, staffing and machine requirements, operator work distribution, load and mix levelling, weekly schedules (how will the production employees know what to work on next?), required supermarket, FIFO size (if any), etc.),
  • For batch processes (if any), production lot size and trigger points,
  • List of improvements to be made to achieve the proposed future state.

Problem 2) Identify the following improvements (if any) you've made by implementing lean:

 

Before

After

Lead time

   

Value added time

   

Inventories

   

Inventory Turns

3

 

Operators

   

Productivity

   

Uptime

   

Yield

   


Problem 3) If the demand is increased by 1 shipset per month and is expected to stay at this level in the foreseeable future, explain what kind of impact this will have on your production system and how you will cope with this increase. Be brief but specific in your recommendations.

Attachment:- Case Study-Lean Manufacturing.rar

Request for Solution File

Ask an Expert for Answer!!
Other Subject: Improve strat operations by designing a lean value
Reference No:- TGS03049868

Expected delivery within 24 Hours