If a 96-inch brick sewer n 0015 is laid on a slope of 001


If a 96-inch brick sewer (n = 0.015) is laid on a slope of 0.01% is set to be rehabilitated with GIPL (n = 0.01) that will need 2-inches all around it. How much more flow, in cfs will be attained with this project?

Request for Solution File

Ask an Expert for Answer!!
Civil Engineering: If a 96-inch brick sewer n 0015 is laid on a slope of 001
Reference No:- TGS0636602

Expected delivery within 24 Hours