Identify the critical path and hence ascertain the minimum


Marsh and Root Construction have won the contract to widen and resurface a section of road. The site manager has identified the following tasks together with the tasks that must precede them and their anticipated durations:

1794_1fbab13b-5eae-4d68-9fcd-a05ccc653409.png

1936_ce59e649-e5a4-41e0-b3cc-6d373905c998.png


(a) Construct a network to portray the project.

(b) Identify the critical path and hence ascertain the minimum duration for these roadworks.