I want you to create a sequence list of 30 activities that


Construction Management Assignment -

We're going to build an extension to existing building, shown in Fig 1 to 4.

Fig 5 shows the expansion plans.

1. I want you to create a sequence list of 30 activities that will be required to complete the work. For example asphalt demolition.

Consider tasks that have to do with: Demolition, Site utilities, Roofing, Masonry, Carpentry, Steel erection, Doors, frames and windows, etc.

2. Determine exactly the manpower, equipment, and material required for each task.

3. Sequence the tasks to obtain the greatest efficiency.

  • Minimize material handling
  • Minimize traveling for both labor and equipment
  • Keep equipment constantly in motion

So you have to provide a thorough analysis with the 30 activities required to complete the task and describe how it can be done in a safe manner, and then complete the table below for the 25 activities.

Activity

Crew

Equipment

Material

Notes (if needed)

 

 

 

 

 

Attachment:- Assignment.rar

Request for Solution File

Ask an Expert for Answer!!
Dissertation: I want you to create a sequence list of 30 activities that
Reference No:- TGS01621368

Expected delivery within 24 Hours