Hs2061 information systems project management individual


Information Systems Project Management Individual assessment - Case Study - FURPS+

For the Signed, Sealed, Delivered case study supplied in assignment 1, produce a professionally formatted document to include the following:

1. Feasibility Analysis

  • Technical Feasibility
  • Economic Feasibility
  • Operational Feasibility

2. Requirements Analysis

  • Functional Specification
  • Non-functional Specification

3. Project constraints

4. Project Work Breakdown Structure

As a guide, the content of the report should be between 2-3 pages.

Request for Solution File

Ask an Expert for Answer!!
Management Information Sys: Hs2061 information systems project management individual
Reference No:- TGS02313438

Expected delivery within 24 Hours