How was the method ineffective or what was it lacking


Assignment

Write about how the Critical Path Method is used to develop the project schedule, map this to a project which you have worked on (personally, professionally or academically).

How has the critical path method kept the project on schedule?

Or, if the method wasn't used, how could it have helped to keep the project on schedule?

How was the method ineffective, or what was it lacking?

Format your assignment according to the following formatting requirements:

1. The answer should be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides.

2. The response also includes a cover page containing the title of the assignment, the student's name, the course title, and the date. The cover page is not included in the required page length.

3. Also include a reference page. The Citations and references should follow APA format. The reference page is not included in the required page length.

Solution Preview :

Prepared by a verified Expert
Project Management: How was the method ineffective or what was it lacking
Reference No:- TGS03011400

Now Priced at $40 (50% Discount)

Recommended (98%)

Rated (4.3/5)