How they plan to meet the tmdl requirements the current


Assignment

Write a 1 to 2 page essay to answer the following questions. The essay should be wordprocessed, 12 point font, 1.5 spacing, 1" margins. Use only MS Word format. Submit your essay via Canvas by the beginning of class on Friday October 14th. Please include the water body in the file name; for example: "HW6 Spring Creek.docx".

Choose one water body or stream segment in the State of UT that has an approved Total

Maximum Daily Load (TMDL) study:

https://www.deq.utah.gov/ProgramsServices/programs/water/watersheds/approvedtmdls.htm

Briefly summarize the following in a narrative essay:

• the location and general description of the water body or stream segment
• all Beneficial Use Classification(s), and which use(s) is/are impaired (cross-check the TMDL with updated info at: https://mapserv.utah.gov/surfacewaterquality/)
• the cause(s) of the impairment (pollutant(s) of concern)
• the current total load for one pollutant (concentration, mass loading rate, or loading)
• the required load reduction and/or water quality endpoint for that one pollutant
• the main point sources and non-point sources for that one pollutant
• how they plan to meet the TMDL requirements.

Attachment:- Attachments.rar

Solution Preview :

Prepared by a verified Expert
Dissertation: How they plan to meet the tmdl requirements the current
Reference No:- TGS01652438

Now Priced at $40 (50% Discount)

Recommended (96%)

Rated (4.8/5)