How much overhead was assigned to each of the three jobs


Problem

Southern Rim Parts estimates its manufacturing overhead to be $472,500 and its direct labor costs to be $1,050,000 for year 1. The first three jobs that Southern Rim worked on had actual direct labor costs of $64,000 for Job 301, $89,000 for Job 302, and $170,000 for Job 303. For the year, actual manufacturing overhead was $404,000 and total direct labor cost was $835,000. Manufacturing overhead is applied to jobs on the basis of direct labor costs using predetermined rates.

Required:

a. How much overhead was assigned to each of the three jobs, 301, 302, and 30?

b. What was the over- or underapplied manufacturing overhead for year 1?