How much idle time is there for each job


Operation Management Homework

Learning Outcome:

• Understand the concept of process selection, forecasting, capacity planning, production forecast methods and schedule operations.

• Apply knowledge and skills to optimize production objective of maximizing profits using qualitative and quantitative techniques in related areas of operations management.

• Exhibit the knowledge of lean system, quality controls and green systems

Task

Problem I:

• Workers should be given more control over the inspection for their own work. Discuss the pros and cons of this situation?

Problem II:

• What are the advantages of Exponential smoothing over the Moving average and the Weighted moving average?

• Explain the aggregate planning strategy?

Problem III:

Sequence the jobs shown below by using a Gantt chart. Sequence the jobs in priority order 1, 2, 3, 4.

Job Work      Center/Machine Hours       Due Date (days)
1                         A/3, B/2, C/2                         3
2                         C/2, A/4                                2
3                         B/6, A/1, C/3                         4
4                         C/4, A/1, B/2                         3

• Using finite capacity scheduling, draw a Gantt chart for the schedule.
• What is the make span?
• How much machine idle time is there?
• How much idle time (waiting time) is there for each job?
• When is each job delivered?
• Which department is the bottleneck?
• Calculate the machine utilization?

Format your homework according to the give formatting requirements:

• The answer must be using Times New Roman font (size 12), double spaced, typed, with one-inch margins on all sides.

• The response also includes a cover page containing the student's name, the title of the homework, the course title, and the date. The cover page is not included in the required page length.

• Also include a reference page. The references and Citations should follow APA format. The reference page is not included in the required page length.

Request for Solution File

Ask an Expert for Answer!!
Operation Management: How much idle time is there for each job
Reference No:- TGS03086556

Expected delivery within 24 Hours