How many units should be shipped from each manufacturing


Chapter 9 Problems

 9-11 The Krampf Lines Railway Company specializes in coal handling. On Friday, April 13, Krampf had empty cars at the following towns in the quantities indicated:

TOWN

SUPPLY OF CARS

Morgantown

35

Youngstown

60

Pittsburgh

25

By Monday, April 16, the following towns will need the numbers of coal cars listed:

TOWN

DEMAND FOR CARS

Coal Valley

30

Coaltown

45

Coal Junction

25

Coalsburg

20

Using a railway city-to-city distance chart, the dispatcher constructs a mileage table for the preceding towns. The result is shown in the table on this page. Minimizing total miles over which cars are moved to new locations, compute the best shipment of coal cars.

Table for Problem 9-11

TO FROM

COAL VALLEY

COALTOWN

COAL JUNCTION

COALSBURG

MORGANTOWN

50

30

60

70

YOUNGSTOWN

20

80

10

90

PITTSBURGH

100

40

80

30

9-13 Finnish Furniture manufactures tables in facilities located in three cities-Reno, Denver, and Pittsburgh. The tables are then shipped to three retail stores located in Phoenix, Cleveland, and Chicago. Management wishes to develop a distribution schedule that will meet the stores' demands at the lowest possible cost. The shipping cost per unit from each of the sources to each of the destinations is shown in the following table:

TO FROM

PHOENIX

CLEVELAND

CHICAGO

RENO

10

16

19

DENVER

12

14

13

PITTSBURGH

18

12

12

The available supplies are 120 units from Reno, 200 from Denver, and 160 from Pittsburgh. Phoenix has a demand of 140 units, Cleveland has a demand of 160 units, and Chicago has a demand of 180 units. How many units should be shipped from each manufacturing facility to each of the retail stores if cost is to be minimized? What is the total cost?

9-23 Four automobiles have entered Bubba's Repair Shop for various types of work, ranging from a transmission overhaul to a brake job. The experience level of the mechanics is quite varied, and Bubba would like to minimize the time required to complete all of the jobs

He has estimated the time in minutes for each mechanic to complete each job. Billy can complete job 1 in 400 minutes, job 2 in 90 minutes, job 3 in 60 minutes, and job 4 in 120 minutes. Taylor will finish job 1 in 650 minutes, job 2 in 120 minutes, job 3 in 90 minutes, and job 4 in 180 minutes.

Mark will finish job 1 in 480 minutes, job 2 in 120 minutes, job 3 in 80 minutes, and job 4 in 180 minutes. John will complete job 1 in 500 minutes, job 2 in 110 minutes, job 3 in 90 minutes, and job 4 in 150 minutes. Each mechanic should be assigned to just one of these jobs. What is the minimum total time required to finish the four jobs? Who should be assigned to each job?

9-33 Bechtold Construction is in the process of installing power lines to a large housing development. Steve Bechtold wants to minimize the total length of wire used, which will minimize his costs. The housing development is shown as a network on this page. Each house has been numbered, and the distances between houses are given in hundreds of feet. What do you recommend?

Attachment:- Chapter 9 Problem.rar

Solution Preview :

Prepared by a verified Expert
Financial Management: How many units should be shipped from each manufacturing
Reference No:- TGS02797023

Now Priced at $40 (50% Discount)

Recommended (91%)

Rated (4.3/5)