How many days does it take for the snowpack to be ripe


Problem

A snowpack has the following characteristics:

a) hs = 250 cm
b) ps = 390 kg/m3
c) Ts = -3.5oC

• The net flux of energy during the melt period is 8.5 MJ/(m2*day). How many days does it take for the snowpack to be isothermal at 0°C? Assume the melt temperature to be 0oC.

• How many days does it take for the snowpack to be ripe? Assume a liquid water holding capacity of 3% of SWE.

• How many days does it take for the snowpack to then completely melt?

Request for Solution File

Ask an Expert for Answer!!
Other Subject: How many days does it take for the snowpack to be ripe
Reference No:- TGS03235557

Expected delivery within 24 Hours