How do you calculate throughput time and cycle time


Problem: How do you calculate throughput time and cycle time in a production process based on the following process flow? 

Operation A is 240 units/hr

Operation B is 180 units/hr

Operation C is 200 units/hr

These operations are followed by Work in Process Storage

And the final Operation D is 300 units/hr