Gven the product structure master production schedule and


1. Given the product structure, master production schedule, and inventory status in Figure and assuming the requirements for each BOM item is 1:

a) Develop a gross requirements plan for Item C;

b) Develop a net requirements plan for Item C. 'PK

2. Based on the data in Figure, complete a net material requirements schedule for:

a) All items (10 schedules in all), assuming the requirement for each BOM item is 1.

b) All 10 items, assuming the requirement for all items is 1, except B, C, and F, which require 2 each.

PERIOD 8 9 10 11 12
Gross requirements: A 100
50
150
Gross requirements: H
100
50

ITEM ON HAND LEAD TIME
A 0 1
B 100 2
C 50 2
D 50 1
E 75 2
F 75 2
G 75 1
H 0 1
J 100 2
K 100 2