Given the information about an impending mining operation


Problem

Given the following information about an impending mining operation, calculate the amount of waste material generated over the life of the mine. Overall stripping ratio (SRo): 3.2 Mine life: 25 years Density of the ore: 2700 kg/m3 Density of the waste /overburden: 1750 kg/m3 Average Cu grade of the ore reserve: 2.9% Dimensions of ore reserve 2200m long, 345 m wide, 155 high (thickness) Mill recovery: 92.4%.