Give the goal programming model


Durham Designs manufactures home furnishings for department stores. Planning is underway for the production of items in the "Wildflower" fabric pattern during the next production period.

Bedspread                    Curtains      Dust       Ruffle
Fabric required (yds)          7              4            9
Time required (hrs)          1.5             2            .5
Packaging material            3               2             1
Profit                               12             10            8

Inventory of the Wildflower fabric is 3000 yards. Five hundred hours of production time have been scheduled. Four hundred units of packaging material are available.

Each of these values can be adjusted through overtime or extra purchases.

Durham has the following goals:

Priority 1: Achieve a profit of $3200,

Priority 2: Avoid purchasing any more fabric or packaging material than is available, and

Use all of the hours scheduled.

Give the goal programming model, then solve and report the solution.

Solution Preview :

Prepared by a verified Expert
Operation Research: Give the goal programming model
Reference No:- TGS01439149

Now Priced at $25 (50% Discount)

Recommended (97%)

Rated (4.9/5)