Find the value of make-span using the sequence


Consider the following data for a five-job, 2-machine, flow-shop problem. Find the value of make-span (minimum time to complete all jobs) using the sequence ABCDE. (Note: It is suggested that you draw the Gantt chart first.)
Time Time

Job M1 M2
A 1 2
B 4 2
C 1 3
D 5 4
E 3 5

Answer

16

19

20

30