Consider the following data for a five-job, 2-machine, flow-shop problem. Find the value of make-span (minimum time to complete all jobs) using the sequence ABCDE.(Note: It is suggested that you draw the Gantt chart first.)

Time
Job M1 M2
A 1 2
B 4 2
C 1 3
D 5 4
E 3 5