Find the total income for the optimum number of days c find


A construction Company has an expenditure rate of E'(x)=e^0.17x dollars per day on a particular paving job and an income rate dollars per day on the same job, where x is the number of days from the start of The job. the company's profit on that job will equal total income less total expenditures. profit will be maximized if the job ends at the optimum time which is the point where the two curves meet. A) find the optimum number of days for the job to last B) find the total income for the optimum number of days C) find the total expenditures for the optimum number of days D) find the maximum profit for the job

Solution Preview :

Prepared by a verified Expert
Mathematics: Find the total income for the optimum number of days c find
Reference No:- TGS02873764

Now Priced at $10 (50% Discount)

Recommended (92%)

Rated (4.4/5)