Find the swell for a soil which weighs 1600kgm in bank and


Part A

Question 1

In aid of Diagram discuss the types of Earth moving used in the field of Civil Engineering

Question 2

Discuss on Hoisting and Conveying Equipment and elaborate clearly why it is very important in the field of Civil Engineering.

Question 3

Discuss on the following; cofferdams, caissons and piling and elaborate clearly on their application on the field of Civil Engineering.

Question 4

Relate the use of Pumps and Compressors into Civil Engineering works.

Question 5

List and discuss five (5) factors that influence the use of plants in large Civil Engineer in Works

Part B -

CRFG engaged by the Fiji Government to upgrade the Princes road which is a 50million Project and 3 years Contract You were recruited as Civil engineering Technician for China Railway First Group (CRFG) and you are assigned to carry out the following

1. Draw a site layout of your site office. (Location)

2. Prepare a Typical Cross Section of the road (Cut & fill)

3. Work Program (Gant Chart)

4. Bill of Quantities

Part C

Question 1

A sandy clay soil being excavated from a road cutting and re-used for fill has the following characteristics:

Bank density = 1600kg/m3

Loose Density = 1250kg/m3

Compacted Density = 2000kg/m3

Find the Load Factor (I), the shrinkage (%), and what volume 152,000Lm3 would be after compaction

Question 2

Find the swell for a soil which weighs 1600kg/m in bank and 1300kg/m3 in bank and 1300kg/m3 Loose.

Question 3

What is the shrinkage factor for a mass of soil that takes up 1.5m3 in bank and reduces down to 1.2m3 after compaction

Question 4

Calculate the Load Factor for clay if the percentage swell from the bank state is 25%.

Question 5

If a mass of soil reduces volume by 23% from the bank condition after compaction then what is the shrinkage factor