Find the minimum number of kanbans needed for this part


Material handlers use push carts to move parts around a plant. A cart load is used as the minimum production quantity-each cart holds 12 parts. Replenishment lead time for a part is 4 hours and its demand rate is 100 units per 8 hour day.

a) Find the minimum number of kanbans needed for this part.

b) Suppose that a 10% safety factor is desired. How many kanbans are needed then?