Find out the total variable costs of the project


Problem:

A firm is reviewing a project with labor cost of $9.40 per unit, raw materials cost of $25.65 a unit, and fixed costs of $15,000 a month. Sales are projected at 11,400 units over the 3-month life of the project.

Required:

Question: What are the total variable costs of the project?

  • $292,410
  • $207,285
  • $414,570
  • $399,570
  • $384,570

Note: Please show how you came up with the solution.