Find out the total variable costs of the project


Problem:

A firm is reviewing a project with labor cost of $6.80 per unit, raw materials cost of $23.05 a unit, and fixed costs of $14,000 a month. Sales are projected at 8,800 units over the 3-month life of the project.

Required:

Question: What are the total variable costs of the project?

  • $276,680
  • $262,680
  • $138,340
  • $248,680
  • $202,840

Note: Provide support for rationale.