Explains stakeholder expectations that should be set


Assignment: SDLC Comparison

You have been hired to implement the CRM system for WeLoveVideo, Inc. Part of your job is to propose and recommend a project approach based on several models. A meeting is scheduled for next week with the WeLoveVideo, Inc. CIO to discuss your recommendations on the project approach.

Prepare for this meeting by developing a 6 to 8 slides multimedia-rich presentation that:

1) Explains the typical phases that comprise an entire systems project for waterfall and Agile SDLCs

2) Illustrates differences in documentation produced for waterfall and Agile SDLCs, with an explanation as to why it would or would not be used

3) Explains stakeholder expectations that should be set based on the chosen SDLC

4) Outlines the pros and cons associated with each waterfall and Agile SDLC and when to use each

5) Creates a graphic summary or chart comparing waterfall and Agile for the WeLoveVideo, Inc. CRM project, including features, team, delivery, and feedback

6) Lists attributes within WeLoveVideo, Inc. that would dictate your recommendation on the type of SDLC you would lean toward

Format your assignment according to the give formatting requirements:

• The answer must be using Times New Roman font (size 12), double spaced, typed, with one-inch margins on all sides.

• The response also includes a cover page containing the student's name, the title of the assignment, the course title, and the date. The cover page is not included in the required page length.

• Also include a reference page. The references and Citations should follow APA format. The reference page is not included in the required page length.

Solution Preview :

Prepared by a verified Expert
Software Engineering: Explains stakeholder expectations that should be set
Reference No:- TGS03100616

Now Priced at $45 (50% Discount)

Recommended (94%)

Rated (4.6/5)