Explain the total manufacturing cost assigned to job


Weaver Company's predetermined overhead rate is $18.00 per direct labor and its direct labor wage rate is $12.00 per hour. The following information pertains to job A-200:
direct materials $200 and direct labor $120.00

1. What is the total manufacturing cost assigned to job A-200?
2. if job a-200 consists of 50 units, what is the average cost assigned to each unit included in the job?