Explain how the risk assessment of the three projects impact


Homework: Project Portfolio Risk

The PMC corporate safety officer, Sid Johnson, is visiting the region prior to the visit of CEO Les Walker. Mr. Johnson has requested a complete risk analysis of the top three risk projects in the region. The regional safety manager met with the SLA operations manager to select the top three risk projects. The Argentina Copper Mine Dos, ATT Chile Fiber Optics project, and the Catamarca Bridge projects were selected for analysis.

For this Homework, read "Trouble hits the SLA Region: Managing Risks in Project Portfolios" of the PMC Corporation Case Study. Prepare a 3 to 4 pages paper that addresses these items:

i. Assess the risk of each of the three projects mentioned above.

ii. Document the results in a risk register.

iii. Explain how the risk assessment of the three projects impacts the overall risk exposure of the portfolio.

iv. Make recommendations to manage risk based on your assessment of the total project portfolio risk.

v. Prepare a summary of the risk exposure of the project portfolio for the SLA region.

Format your homework according to the following formatting requirements:

i) The answer should be typed, using Times New Roman font (size 12), double spaced, with one-inch margins on all sides.

ii) The response also includes a cover page containing the title of the homework, the student's name, the course title, and the date. The cover page is not included in the required page length.

iii) Also include a reference page. The Citations and references must follow APA format. The reference page is not included in the required page length.

Solution Preview :

Prepared by a verified Expert
Project Management: Explain how the risk assessment of the three projects impact
Reference No:- TGS03087566

Now Priced at $35 (50% Discount)

Recommended (94%)

Rated (4.6/5)