Explain four method for identifying and selecting is project


Assignment: Project Selection And Planning

After last presentation, the board of directors wants to continue consideration of a new webstore for Pine Valley Furniture. The board has asked you to assist them in selecting and initiating which project to do. They are considering a webstore for one of their three target markets:

• Corporate furniture
• Home office furniture
• Student furniture

• The board wants you to help them determine which project to select and get started on the planning process.

Prepare a 10- to 16-slide presentation or write a 3- to 4-page executive summary to help the board choose.

Explain four methods for identifying and selecting IS projects. Compare the characteristics of each and identify the strengths and weaknesses of each method.

Identify valuation criteria when classifying and ranking the three projects, and then rank them.

Summarize the project initiation and planning process so the board knows the next steps.

Format your assignment according to the following formatting requirements:

1. The answer should be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides.

2. The response also includes a cover page containing the title of the assignment, the student's name, the course title, and the date. The cover page is not included in the required page length.

3. Also include a reference page. The Citations and references should follow APA format. The reference page is not included in the required page length.

Solution Preview :

Prepared by a verified Expert
Project Management: Explain four method for identifying and selecting is project
Reference No:- TGS03024668

Now Priced at $40 (50% Discount)

Recommended (96%)

Rated (4.8/5)