Explain expected annual manufacturing


FireOut, Inc. manufactures steel cylinders and nozzles for two models of fire extinguishers: (1) a home fire extinguisher and (2) a commercial fire extinguisher. The home model is a high-volume (54,000 units), half-gallon cylinder that holds 2 1/2 pounds of multipurpose dry chemical at 480 PSI. Thecommercial model is a low-volume (10,200 units), two-gallon cylinder that holds 10 pounds of multi-purpose dry chemical at 390 PSI. Both products require 1.5 hours of direct labor for completion. Therefore, total annual direct labor hours are 96,300 or [1.5 hrs. x (54,000 + 10,200)]. Expected annual manufacturing overhead is $1,557,480. Thus, the predetermined overhead rate is $16.17 or ($1,557,480 ÷ 96,300) per direct labor hour. The direct materials cost per unit is $18.50 for the home model and $26.50 for the commercial model. The direct labor cost is $19 per unit for both the home and the commercial models.

The company's managers identified six activity cost pools and related cost drivers and accumulated overhead by cost pool as follows.









Expected Use of
Drivers by Product
Activity Cost Pools
Cost Drivers
Estimated Overhead
Expected Use of
Cost Drivers

Home
Commercial
Receiving
Pounds
$70,350
335,000
215,000
120,000
Forming
Machine hours
150,500
35,000
27,000
8,000
Assembling
Number of parts
412,300
217,000
165,000
52,000
Testing
Number of tests
51,000
25,500
15,500
10,000
Painting
Gallons
52,580
5,258
3,680
1,578
Packing and shipping
Pounds
820,750
335,000
215,000
120,000




$1,557,480






(a) and (b)
(1) Under traditional product costing, compute the total unit cost of each product. (Round answers to 2 decimal places, e.g. $12.25.)



Home Model
Commercial Model
Total unit cost
$
$

(2) Under ABC, prepare a schedule showing the computations of the activity-based overhead rates. (Round overhead rate to 2 decimal places, e.g. $12.25.)

Activity Cost Pool
Estimated
Overhead

Expected
Use of Cost Drivers

Activity-Based
Overhead Rate
Receiving
$

$ per pound
Forming


$ per machine hour
Assembling


$ per part
Testing


$ per test
Painting


$ per gallon
Packing and shipping


$ per pound


$



Request for Solution File

Ask an Expert for Answer!!
Accounting Basics: Explain expected annual manufacturing
Reference No:- TGS0555643

Expected delivery within 24 Hours