Expected annual overhead costs concepts


If annual overhead costs are expected to be $750,000 and direct labor costs are expected to be $1,000,000, then

A) $1.33 is the predetermined overhead rate.

B) for every dollar of manufacturing overhead, 75 cents of direct labor will be assigned.

C) for every dollar of direct labor, 75 cents of manufacturing overhead will be assigned.

D) a predetermined overhead rate cannot be determined.

Request for Solution File

Ask an Expert for Answer!!
Accounting Basics: Expected annual overhead costs concepts
Reference No:- TGS090364

Expected delivery within 24 Hours