Exolain the direct material


The direct material in your answer is only multiply $14.40 time 2,400 which is the number all the custom seat. However, the problem said that each seat requiere 0.8 direct labor so i did is multiply also time 0.8, at the result my answer was 27,648.please let me know if i am wrong and why?