Establish a wbs to support the project with revised schedule


Assignment: Project Management

Label each file name according to the section of the assignment for which it is written. Additionally, you may create and / or assume all necessary assumptions needed for the completion of this assignment.Section 1: MS Project Exercise

Update the project schedule in MS Project to account for the following changes:

1. Revise the project schedule so that it contains at least five work packages.

2. Establish a WBS to support the project with the revised schedule.

3. Revise the durations of the tasks based on the revised schedule.

Section 2: Work Packages Paper

Write a two to three page paper in which you:

4. Specify the main changes that you have made to the project in question. Next, analyze the key manner in which you have aligned your WBS in order to deliver the project.

5. Provide the costs estimate for the tasks. Note: Your estimate should include, but not be limited to, fixed and variable cost components.

6. Suggest the primary measures that you would use in order to successfully deliver the project.

Format your assignment according to the following formatting requirements:

1. The answer should be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides.

2. The response also include a cover page containing the title of the assignment, the student's name, the course title, and the date. The cover page is not included in the required page length.

3. Also Include a reference page. The Citations and references should follow APA format. The reference page is not included in the required page length.

Solution Preview :

Prepared by a verified Expert
Project Management: Establish a wbs to support the project with revised schedule
Reference No:- TGS02948100

Now Priced at $60 (50% Discount)

Recommended (98%)

Rated (4.3/5)