During two eight-hour shifts 2000 non defective parts are


During two eight-hour shifts, 2000 non defective parts are desired to produce. The standard time to complete the operation is 20 minutes, but the actual time to perform the operation takes longer and it is 30 minutes. Also it is known that one-eighth of the parts that begin fabrication are scrapped. Suppose that each of the machines used for this operation will not be available for two hours of each shift, determine the number of machines required.

Request for Solution File

Ask an Expert for Answer!!
Operation Management: During two eight-hour shifts 2000 non defective parts are
Reference No:- TGS01296774

Expected delivery within 24 Hours