During 2010 durham manufacturing expected job no 51 to cost


Question - During 2010, Durham Manufacturing expected Job No. 51 to cost $300,000 of overhead, $500,000 of materials, and $200,000 in labor. Durham applied overhead based on direct labor cost. Actual production required an overhead cost of $280,000, $550,000 in materials used, and $220,000 in labor. All of the goods were completed. What amount was transferred to Finished Goods?

a. $1,070,000

b. $1,100,000

c. $1,000,000

d. $1,050,000