Draw the decision tree for mfi what is the maximum cost of


(Value of Information): Midwest Freight Inc. (MFI) is a logistics company handling fragile item shipping. MFI has received an order with the stipulation that if the item arrives late, MFI will pay $1,000 for each late day.

MFI will make $40,000 if the item is delivered on time, but will lose $17,000 if it is defective. MFI can easily deliver the system on time. However, it may, with probability 0.5, be defective. The deficiency can be removed by an adjustment that costs $2,000, but this would delay delivery by 10 days. MFI can also test if the item needs adjustment. However, the test is fallible and costs something. A technical company Bob Ability Inc. (BAI) estimates that there is a 0.6 probability that the test will be favorable (the item does not seem to need adjustment). BAI also thinks that if the test is favorable, there is 25% chance that the item does need adjustment; if the test is unfavorable, this chance increases to 87.5%.

1) Draw the decision tree for MFI.

2) What is the maximum cost of the test that MFI would accept?

Request for Solution File

Ask an Expert for Answer!!
Operation Management: Draw the decision tree for mfi what is the maximum cost of
Reference No:- TGS02942228