Download and examine the project task list from the link at


Download and examine the project task list from the link at the bottom of the page. Based on this task list, you will create a PERT chart and write a paper that discusses the following:

• Identify which set of tasks create the critical path.
• Determine which task would be best to crash to reduce the critical path.
• Determine if there is a change to the critical path by crashing the task. Is there a new critical path?
• What other information would be beneficial to know to see if the selected task was the best option for crashing?

Your paper should be 2-to-3-pages, well written and in conformity with the CSU-Global Guide to Writing and APA Requirements for style and writing expectations. Your PERT chart is part of your page requirements. Include a title page and a reference page that includes at least two outside references (not including your textbook) to support your analysis.