Does the parallel machine consider as a special case of


1. Does the parallel machine consider as a special case of flow shop?

2. For Weighted problem of parallel machine, If w=2 needs more time ( the RCT is negative ) , the negative number will be subtracted from RCT of w = 1 ?

3. What is the difference between dependent shop and job shop and can you give examples

4. why minimising the makespan for flow shop problems equals to minimising the idle time and the jobs waiting time?

5. Do the hueristics methods consider as static or dynamic ?

6. Why Dynamic methods are better than static methods in sequancing and scheduling ?

Request for Solution File

Ask an Expert for Answer!!
Operation Management: Does the parallel machine consider as a special case of
Reference No:- TGS01520982

Expected delivery within 24 Hours